ASSIGNMENT- Set 1
Marks 60
Note: Assignment Set -1 must be written within 6-8 pages. Answer all
questions.
Q1.a. Describe the Scoring Method for project selection 5 marks
(150-200) words
Answer : A method of scoring
options against a prioritize requirements list to determine which option best
fits the selection criteria.
The Weighted Scoring Method
b. Discuss the algorithm for solving the shortest-route problem 5 marks(150-200) words
Answer : In recitation we
talked a bit about graphs: how to represent them and how to traverse them.
Today we will discuss one of the most important graph algorithms: Dijkstra's
shortest path algorithm, a greedy algorithm that efficiently finds shortest
paths in a graph. (Pronunciation: "Dijkstra" is Dutch and starts out
like "dike").
Q2. Describe the rules for network construction. Discuss PERT technique
of project planning
10
marks(300-400) words
Answer : The following are the
primary rules for constructing AOA diagram.
1. The starting event and ending
event of an activity are called tail event and head event, respectively.
2. The network should have a
unique
Q3. What do you mean by crash duration? Describe the Time-Cost
Optimization algorithm.
10marks(300-400)
words
Answer : The premise, the whole idea behind Crash, is
brilliant. Succinctly and elegantly explained in the introduction to the French
edition (included in most of the English-language editions), Ballard's book
sounds visionary. It is "an
Q4. Describe how you can choose an appropriate forecasting model.
10 marks(300-400) words
Answer : These options are
briefly described below, and are discussed in more depth in other notes in the
course outline. See the accompanying Forecasting Flow Chart for a pictorial
view of the model-specification process, and refer back to the Statgraphics
Model Specification panel to see how the model features are selected in
Q5.a. Write a note on Graphical Evaluation & Review Technique 5 marks(150-200) words
Answer : The Graphical Evaluation
and Review Technique (GERT) is a schedule development technique that
illustrates loops in an activity sequence, branches between activities, and
different project outcomes. Project managers use GERT to determine alternate
paths of activity flow that can be taken if something goes wrong with the original
schedule.
b. Describe the time-series smoothing
5marks(150-200) words
Answer : Time series data often
arise when monitoring industrial processes or tracking corporate business
metrics. The
Q6. Discuss how you can forecast project cost at completion 10 marks(300-400) words
Answer : Purpose
As a project is executed,
variances occur between the original cost and process planning and the actual
course of the project. Simply shifting activities within floats is enough to
change the pattern of costs in the project. Once the first actual costs have
been incurred, you will find it necessary to check and possibly update the
figures for the
Dear students get fully solved assignments
call us at :- 08263069601
or
mail us at
help.mbaassignments@gmail.com
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.