ASSINGMENT
Q1. What are the stages in the lifecycle management of any machinery?
Answer: 1.
Development
The development stage can be a
protracted stage and will involve activities such as design, planning, costing,
test marketing, etc. The costs are high, with no earned revenue (and thus it
does not register as a stage on the diagram at Figure A1-1). Promotion for
awareness may commence in advance of introduction of the product to the
marketplace.
2
Birth (or Introduction stage)
This is the stage where a product will
be introduced after initial decisions like selection, technology selection,
location and layout design of
Q2. Write short notes on:
v
Fault tree
analysis for improving maintenance effectiveness
Answer:
For improving maintenance effectiveness one of the tools used is the fault tree
analysis. In electrical and control systems, failures are linked to certain
physical portions of the equipment. A fault tree is a network
v Routine maintenance
Answer: Simple, small-scale
activities (usually requiring only minimal skills or training) associated with
regular (daily, weekly, monthly, etc.) and general upkeep of a building,
equipment, machine, plant, or system against normal wear and tear. Expenditures
made for the regular upkeep of physical properties (i.e. Land
v Problems in maintenance scheduling
Answer: The problem of scheduling o-line preventive maintenance of power
generating units is of substantial interest to the electric power industry. A typical
power plant consists of one or two dozen power generating units which can be
individually scheduled for preventive maintenance. Both
v Wrench Time
Answer: Wrench
time is a measure of crafts personnel at work, using tools, in front of jobs.
Wrench time does not include obtaining parts, tools or instructions, or the
travel associated with those tasks. It does not include traveling to or from
jobs. It does not include time spent obtaining work assignments. Obviously, it
does not include break time. These non-wrench time tasks are often necessary to
get work done, but are not "wrench time." The craftsperson is in a
Q3. Why detail analysis and use of different methods are essential
requirements for taking suitable decisions on the equipment replacements?
Explain briefly these methodologies used.
Answer: Much research has been
undertaken in equipment replacement optimization (ERO)including the Texas Department
of Transportation’s (Tudor) ongoing equipment replacement optimization efforts.
A detailed review of the state-of-the art and state of-the-practice literature
of the ERO problem and commercial fleet management systems currently available
worldwide can be seen and examined in a separate research paper (Fan et al.
2011). In summary, previous research efforts have been made to examine the ERO
problem, which can be classified into and solved using
three categories from the
solution approach perspectives:
1) Minimum Equivalent Annual Cost (EAC)
Q4. Explain briefly the ABC classification and reasons behind
recommending ABC and VED
classifications for managing inventory of spare parts for
maintenance?
Answer: ABC classification is a ranking system
for identifying and grouping items in terms of how useful they are for
achieving business goals.
The system requires grouping
things into three categories:
A - extremely important
Q5. Explain briefly the universal principles used for improving
productivity of the maintenance
management
Answer: Total Productive Maintenance (TPM) is a business process
improvement method, developed from the perspective of maintenance management.
TPM concentrates on productivity improvement, primarily by way of maximizing
the availability of equipment.
To do that, small
multidisciplinary teams improve step-by-step the Overall Equipment
Effectiveness (OEE) of their machines or production lines.
Q6. What is meant by ‘Overall Equipment Effectiveness (OEE)’? What are
its constituents and objectives served?
List the OEE Losses?
Answer: Overall equipment effectiveness (OEE) is a hierarchy of metrics
developed by Seiichi Nakajima in 1960's to evaluate how effectively a
manufacturing operation is utilized. It is based on the Harrington Emerson way
of thinking regarding labour efficiency. The results are stated in a generic
form which allows comparison between manufacturing units in differing
industries. It is not however an absolute measure and is best used to identify
scope for process performance improvement, and how to get the improvement. If
for example the cycle time is reduced, the OEE can also reduce, even though
more product is produced for less resource.
OEE measurement is also commonly
Dear
students get fully solved assignments
Send
your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call
us at : 08263069601
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.