Course: Project
Management
Assignment
Marks: 30
Instructions:
·
All Questions carry equal marks.
·
All Questions are compulsory
·
All answers to be explained in not more than 1000 words for question 1
and 2 and for question 3 in not more than 500 words for each subsection. Use
relevant examples, illustrations as far aspossible.
·
All answers to be written individually. Discussion and group work is
not advisable.
·
Students are free to refer to any books/reference
material/website/internet for attempting theirassignments, but are not allowed
to copy the matter as it is from the source of reference.
·
Students should write the assignment in their own words. Copying of
assignments from otherstudents is not allowed.
·
Students should follow the following parameter for answering the
assignment questions.
For Theoretical Answer |
|
For Numerical Answer |
||
Assessment Parameter |
Weightage |
Assessment Parameter |
Weightage |
|
Introduction |
20% |
Understanding and usage of the formula |
20% |
|
Concepts and Application related to the question |
60% |
Procedure / Steps |
50% |
|
Conclusion |
20% |
|
Correct Answer & Interpretation |
30% |
1.
Provide details for each stages of the “Generic Project Life Cycle Model” for a
hypothetical project of conducting Annual Day in your university. Include
specific actions which are required in this project and give your comment about
which will be the most critical stage for this project. (10 Marks)
Answer
1
Introduction
A generic project
life cycle model is a project with a sequence of stages; the management
determines the number of sequences of the cycle and various factors like the
organization's needs in the project, the nature of the project. The project
lifestyle model is described as per the aspects and needs of the project. The
project phase has been started with the start, end and control points according
to the time. Project life cycle modals are of five different types:
incremental, iterative, linear, extreme and adaptive. Every project has its
start and endpoint, and control point.
2. Government is undertaking a major
renovation in railway infrastructure. There are four possible options
(Project-01 to Project-04). Based on your instructions, following data about
the feasibility of the projects were collected. Data is in two parts. The
ratings (on a scale of 1 to 10, where 1 indicate POOR and 10 indicate GOOD) on
eight aspects and financial information. Conduct the feasibility analysis –
based on rating and using (Net Present Value) NPV method (use Discounting Rate
as 10% per year). Give your recommendation for the type of project to be selected
for this purpose.
Feasibility |
Project-1 |
Project-2 |
Project-3 |
Project-4 |
Operational |
3 |
5 |
7 |
7 |
Market |
7 |
6 |
7 |
5 |
Technical |
7 |
2 |
5 |
3 |
Economic |
8 |
2 |
5 |
3 |
Financial |
6 |
10 |
5 |
4 |
Legal and Regulatory |
2 |
5 |
9 |
5 |
Environmental |
2 |
7 |
10 |
7 |
Social |
5 |
2 |
6 |
4 |
|
I |
C1 |
C2 |
C3 |
C4 |
C5 |
C6 |
|
Project-01 |
Cashflow |
-45 |
15 |
15 |
15 |
15 |
15 |
15 |
Project-02 |
Cashflow |
-50 |
20 |
20 |
20 |
20 |
20 |
|
Project-03 |
Cashflow |
-60 |
25 |
25 |
25 |
25 |
|
|
Project-04 |
Cashflow |
-55 |
18 |
18 |
18 |
18 |
18 |
18 |
(10
Marks)
Answer 2
Introduction
Obstruct of roads
and sky, growing energy costs and interest to lessen radiations, have made a
need to move transportation from road and air to rail. Subsequently, rail use
is growing, adding strain to the rail establishment and time prerequisites to
help. The introduction and cutoff of rail establishment are depended upon to be
defended or even improved. Rail course execution and cutoff can be overhauled
by
3. A project has 11 activities: Activity-A
to Activity-K.
a. Prepare a network diagram and list
different chains of activities. Use the following information.
Activity No: |
A |
B |
C |
D |
E |
F |
G |
H |
I |
J |
K |
Predecessor |
|
|
A |
B |
B |
D |
D |
C |
F,G |
E |
H,I,J |
Answer 3
So far the means
engaged with building up the underlying network gave two essential bits of data
a gauge of the undertaking length and the critical path. The underlying network
built is analyzed to change over it into a legitimate, pragmatic network which
fulfills the task prerequisites and gives the premise to successful execution
and control.
This interaction is
called network update. The reason for update is two-crease. First and foremost,
it is worried about improving the nature of the data in the network; data about
the connections and terms of exercises. Besides, it is worried about
guaranteeing that the last network fulfilled the venture destinations.
Activity A B C D E F G H I J K Duration 2 3 3 7 8 3 5 10 4 6 3
b. Compute the project duration and identify critical path. Use the following additional
information.
Ans:
3b
The computations
were so organized so that they could be completed on the IBM Naval Ordinance
Research Computer (NORC) at Dahlgren, Virginia. The strategies are basically
network-arranged methods utilizing a similar guideline. Sprightly and CPM are
essentially time-arranged strategies as in the two of them lead to assurance of
a period plan for the task.
Identifying the
critical path and duration
The undertakings on
the critical path are
Dear students, get latest Solved NMIMS assignments and
case study help by professionals.
Mail us at : help.mbaassignments@gmail.com
Call us at : 08263069601
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.