ASSIGNMENT
DRIVE
|
SUMMER 2014
|
PROGRAM
|
MBADS/ MBAFLEX/
MBAHCSN3/ MBAN2/ PGDBAN2
|
SUBJECT CODE
& NAME
|
MB 0044 -
PRODUCTION AND OPERATION MANAGEMENT
|
BK ID
|
B1627
|
SEMESTER
|
2
|
CREDITS
|
4
|
MARKS
|
60
|
Note: Answer all questions. Kindly note that answers for 10 marks
questions should be approximately of 400 words. Each question is followed by
evaluation scheme.
Q1. Explain the four basic varieties
of layouts for manufacturing facilities.
(Process layout – 4 marks; Product
layout- 3 marks; Group technology layout – 2 marks; Fixed position layout – 1
mark) 10 marks
Answer : Basic varieties of layouts for manufacturing
facilities:
Facility layout means planning for the
location of all machines, utilities, employee workstations, customer service
areas, material storage areas, aisles, rest rooms, lunch rooms, drinking
fountains, internal walls, offices, and computer rooms, and for the flow
patterns of materials and people around, into, and within buildings.
1. Process layout :
Q2. The major decision areas in supply
chain management have both strategic and operational elements .Explain these
decision areas in detail.
(Location decisions; Production
decision; Inventory decisions; Transportation decisions- 10 marks, i.e 2.5
marks each)10 marks
Answer : The major decision areas in
supply chain management:
Location decisions:
The geographic placement of production
facilities, stocking points, and sourcing points is the natural first step in
creating a supply chain. The location of facilities involves a commitment of
resources to a long-term plan. Once the size, number, and location of these are
determined, so are the possible paths by which the product flows through to the
final customer. These decisions are of great significance to a firm since they
represent the basic strategy for accessing customer markets, and will have a
considerable impact on revenue, cost, and level of service. These decisions
should be determined by an optimization routine that considers production
costs, taxes, duties and
Q3. Business process is a total
response that a business undertakes utilizing the resources and delivering the
outputs that create a value for the customer. Business process modeling refers
to a set of activities undertaken to optimize the business process. Business
process modeling can be categorized into two parts – Logical processing
modeling and physical process modeling. Explain in detail of the two processes
of modeling.
(Logical processing modeling :
Definition – 1 mark , Steps to be followed to make the work smoother – 2 marks,
Explanation of logical process model including what it consists of ,
represents, improves and identifies; logical modeling formats ;ways of
representing logical process modeling – 4 marks; physical process modeling
including definition, what it deals with , why objects during physical modeling
vary on the database software being used, outcomes- 3 marks) 10 marks
Answer : Logical processing modeling:
Logical Process Modeling is the
representation of a business process, detailing all the activities in the
process from gathering the initial data to reaching the desired outcome.
Logical process modeling methods provide a description of the logical flow of
data through a business process.
Steps to be followed to make the work
smoother:
Q.4 Write short notes on:
a) Dimensions of quality
Answer : Quality is inherent in the product or service that is
rendered to the customer. Since we are attempting to measure the same, we will
look into those aspects of quality, called dimensions of quality.
·
Quality of design – A product is designed
keeping in view the customers’ requirement. For designing a product, the
manufacturer or service provider should be aware of the specifications of
different features required to incorporate in the product.
·
Conformance to design – Conformance to
design is the degree to which the manufactured product or delivered service
meets the parameters that have been incorporated in the design. It verifies
that the variability in the
b) Characteristics of project mindset
Answer : Project management is all about the mindset. Figure
depicts all the major characteristics of a project mindset.
Q5. It is possible to work according
to the project plan only by careful monitoring of the project progress. There
are various steps involved in monitoring and controlling a project from start
to end. One of the steps is progress control of a project which can be achieved
by completing certain steps. Explain the steps of progress control.
(Monitor performance, Update schedule,
Update costs, Re-plan stage schedule, Conduct team status review, Create status
report, Create flash report, Project status reports - 10 i.e. 1.25 marks each)
10 marks
Answer : Steps of progress control:
The project progress depends on many
factors. All the factors contribute equally in monitoring and controlling the
project. The step of progress control is the important one. The progress
control of a project can be achieved by considering the following:
1. Monitor performance:
Q6. Write short notes on
a) Pure strategies employed to assist
in aggregate planning
Answer : Three focused or pure strategies are:
Vary production to match
demand by changes in employment
(Chase demand strategy): This strategy
permits hiring and layoff of workers as required. When the output is to be
increased more workers are added and when the output is to be decreased,
workers are removed.
Produce at a constant
b) Approaches to scheduling
Answer : Approaches to Scheduling
There are two types of approaches to scheduling. They
are forward scheduling and backward scheduling. These are used to ensure that
the lead time for manufacture is kept to a minimum and the products are
supplied to the customers as quickly as possible.
Dear students get fully solved assignments
Send your semester & Specialization name to our
mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
(Prefer mailing. Call in emergency )
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.