0017 – ADVANCED PRODUCTION AND PLANNING CONTROL
Q.1:
Explain Various Functions of Production Planning and Control.
Explain
Various Functions of Production Planning and Control.
Answer:
The
main functions of PPC are the coordination of all the activities, which exist
during production or manufacturing.
Materials : This
Materials : This
Q.2:
Explain the concept of Master Schedule. Also define the Characteristics of the
master schedule.
A
Concept of Master Schedule
Characteristics of the master schedule
ANS:
Concept
of Master Schedule:
Master schedule is the presentation
of the production schedule at the summary level, depicting various key
elements, resulting
Q.3:
Define the various steps of VA.
A
Various steps of VA
ANS:
Various
steps of VA:
Step
1:Information stageIn the first step, all
the relevant information about the material is collected. This information
comprises cost, manufacturing methods, performance characteristics, etc. It is
not only the first step but also an
Q.4:
Write Short notes on
a.
Hybrid 1: MRP with lean principles
b.
Hybrid 2: Kanban with MRP planning
c.
Hybrid 3: MRP for capacity and long lead time
d.
Hybrid 4: Pull system with spike control
ANS:
a.
Hybrid 1: MRP with lean principles:
When the demand pattern is very
stable and has a radical design change of product, most of the planning and
execution can be achieved by using MRP. However, to provide better stability to
the system, some of the lean principles are
Q.5:
Differentiate between Mass Production and Batch Production.
A
Mass Production
Batch
Production
ANS:
Mass
Production:
A term sometimes used in the popular
press for a line process that uses the make-to-stock strategy. Mass production
is the
Q.6:
Elaborate various Elements of cost.
A
Elements of cost
ANS:
Elements
of cost:
The total cost consists of three
elements namely, material, labour, and expenses. These three elements are
further classified into direct
Dear students get fully solved
assignments
Send your semester &
Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.