MC0084-SOFTWARE PROJECT MANAGEMENT & QUALITY
ASSURANCE
|
CREDIT
|
4
|
BK ID
|
B0958, B0959
|
MAX.MARKS
|
60
|
Note: Answer all questions. Kindly note that answers for 10 marks
questions should be approximately of 400 words. Each question is followed by
evaluation scheme.
1 Differentiate between Matrix Organizational and Networked Organizational
Structures.
Answer : The Matrix Structure
A matrix structure is the most
complex of all designs because it depends upon both vertical and horizontal
flows of authority and communication (hence, the term matrix). In contrast,
functional and divisional structures depend primarily on vertical flows of
authority and communication. A matrix structure can result in higher overhead
because it creates more management positions. Other characteristics of a matrix
structure that contribute
2 Explain any five project management activities?
Answer : The concept of project
management originated when the pyramids were built in Cairo, Egypt. A project
manager was commissioned to build a final resting place for the pharaoh,
according to Reference for Business. In modern times, experts pinpoint five
basic phases of project management. During these phases, small company managers
assign and participate in various activities. The activities are contingent
upon the company's industry and what it sells, but the planning and execution
processes
3 Explain waterfall and spiral life cycle model.
Answer : Waterfall lifecycle model
Waterfall model is the most well
known software lifecycle development model. It is very simple to understand and
use. Each
next phase in this model must
beginning only after the previous phase is over.
Waterfall software development
model may b
4 Explain any five software cost estimation methods.
Answer :1) Expert Judgment Method
Expert judgment techniques
involve consulting with software cost estimation expert or a group of the
experts to use their experience and understanding of the proposed project to
arrive at an estimate of its cost.
Generally speaking, a group
consensus technique, Delphi technique, is the best way to be used. The
strengths and weaknesses are
2) Estimating by Analogy
Estimating by analogy means
comparing the proposed project to previously completed similar project where
the project development information id known. Actual data from the completed
projects are extrapolated to estimate the proposed project. This method can be
used either at system-level or at the component-level.
Estimating by analogy is
relatively straightforward. Actually in some respects, it is a systematic form
of expert judgment since experts often search for
4) Bottom-up Estimating Method
Using bottom-up estimating
method, the cost of each software components is estimated and then combine the
results to arrive at an estimated cost of overall project. It aims at
constructing the estimate of a system from the knowledge accumulated about the
small software components and their interactions. The leading method using this
approach is COCOMO's detailed model.
The advantages:
·
It permits the software group to handle
5)Algorithmic Method
General discussion
The
algorithmic method is designed to provide some mathematical equations to
perform software estimation. These mathematical equations are based on research
and historical data and use inputs such as Source
5 What is Six Sigma? Why is it required? Explain the steps for (IEEE)
process improvement.
Answer : Six Sigma is a
management philosophy developed by Motorola that emphasizes setting extremely
high objectives, collecting data, and analyzing results to a fine degree as a
way to reduce defects in products and services. The Greek letter sigma is
sometimes used to denote variation from a standard. The philosophy behind Six
Sigma is that if you measure how many defects are in a process, you can figure
out how to systematically eliminate them and get as close to perfection as
possible. In order for a company to achieve Six Sigma, it cannot produce more
than 3.4 defects per million opportunities, where an
6 Differentiate between Integration Testing and System Testing.
Answer : Integration testing tests integration or interfaces between
components, interactions to different parts of the system such as an operating
system, file system and hardware or interfaces between systems.
Also after integrating two
different
Dear students get fully solved assignments
Send your semester &
Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call us at : 08263069601
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.