Q.1
Maximise z = 3x1 + 4x2
Subject to constrains 5x1 + 4x2≤ 200;
3x1 + 5x2 ≤150;
5x1 + 4x2≤100;
8x1 + 4x2≤80,
x1≤
0, x2≤ 0
Answer : The
Q.2
State the ways in which customers in a queue are served.
Answer : Queuing theory is the mathematical study of
waiting lines, or queues. In queuing theory a model is constructed so that
queue lengths and waiting times can be predicted.
Queuing theory started
Q.3
Explain the use of simulation in networks? What are the advantages of using
simulation?
Answer :
Simulation: is a representation of reality
through the use of a model or other device, which will react in the similar
manner as reality under a given set of conditions.
Q.4
Explain maximin-minimax principle. Briefly describe the characteristics of
competitive game
Answer
: Maxim in – Minima Principle
Q.5
A project has 10 activities. The following table shows the information about
the activities.
Table 14.5: Activities information
Activity
|
Preceding
activity
|
Duration in
weeks
|
A
|
–
|
6
|
B
|
–
|
3
|
C
|
A
|
5
|
D
|
A
|
4
|
E
|
A
|
3
|
F
|
C
|
3
|
G
|
D
|
5
|
H
|
B, D, E
|
5
|
I
|
H
|
2
|
J
|
I, G, F
|
3
|
·
Draw the network
·
Find the project duration
·
Identify the CPM
·
Prepare the schedule
Answer :
Q.6
Discuss different types of service systems?
Answer : Partly based on the experiences of SusProNet,
a major Thematic network under the EU’s 5th Framework Research Programme, this
paper discusses the environmental and economic prospects of product-service
systems (PSS). Since unlike
MB0048_MBA_Sem2_Fall/August
2012
Master
of Business Administration - MBA Semester 2
MB0048
– Operations Research - 4 Credits
Assignment
Set- 2 (60 Marks)
Note:
Each question carries 10 Marks. Answer all the questions.
Q.1
Explain project management (PERT) & Project scheduling of PERT.
Answer
: Some key points about PERT are as
follows:
1. PERT was developed in connection
with an R&D work. Therefore, it had to cope with the uncertainties that are
associated with R&D activities. In PERT, the total project duration is
regarded as a random variable. Therefore, associated probabilities are
calculated so as to characterise it.
Q.2
Write a short note on Monte-Carlo simulation? What are the Limitations of using
Simulation?
Answer : Simulation is also called experimentation in
the management laboratory. While dealing with business problems, simulation is
often referred to as ‘Monte Carlo Analysis’. Two American mathematicians, Von
Neumann and Ulan, in the late 1940s found a problem in the field of nuclear
physics too complex for analytical solution and too dangerous for
Q.3
In a rectangular game, pay-off matrix of player A is as follows:
I)
Solve the game.
ii)
Write down the pay-off matrix of B and then, solve the game.
Answer : Value is
Q.4
A marketing manager has 5 salesmen and 5 sales districts. Considering the
capabilities of the salesman and the nature of districts, the marketing manager
estimates that the sales per month (in hundred rupees) for each salesman in
each district would be as follows.
Sales districts
|
|
A
|
B
|
C
|
D
|
E
|
Salesmen
|
1
|
32
|
38
|
40
|
28
|
40
|
2
|
40
|
24
|
28
|
21
|
36
|
|
3
|
41
|
27
|
33
|
30
|
37
|
|
4
|
22
|
38
|
41
|
36
|
36
|
|
5
|
29
|
33
|
40
|
35
|
39
|
Find
the assignment of salesman to districts that will result in maximum sales.
Answer
: Solution:
Q.5
Define PERT & CPM. Write down the basic difference between PERT and CPM.
Answer : A PERT chart is a project
management tool used to schedule, organize, and coordinate tasks within a
project. PERT stands for Program Evaluation Review Technique, a methodology
developed by the U.S. Navy in the 1950s to manage the Polaris submarine missile
program. A similar methodology, the Critical Path Method (CPM) was developed
for project management in the private sector at about the same time.
Q.6
Explain Linear programming problem by giving two examples & write any 3
applications of Linear Programming problem Salesman
Answer : The LPP is a class of mathematical
programming
Dear
students get fully solved assignments
call
us at :- 08263069601
or
mail
us at help.mbaassignments@gmail.com
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.