Dear
students get fully solved assignments
Send
your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call
us at : 08263069601
(Prefer
mailing. Call in emergency )
ASSIGNMENT
DRIVE
|
SPRING 2014
|
PROGRAM
|
MBADS (SEM 4/SEM 6) MBAFLEX/ MBAN2 (SEM 4)
PGDPMN (SEM 2)
|
SUBJECT CODE & NAME
|
PM 0017 –PROJECT QUALITY MANAGEMENT
|
BK ID
|
B1346
|
SEMESTER
|
4
|
CREDITS
|
4
|
MARKS
|
60
|
Note: Answer all questions. Kindly note that answers for 10 marks
questions should be approximately of 400 words. Each question is followed by
evaluation scheme.
Q.1 Write short notes on:
- Quality
control vs. quality assurance
- Project
requirement documents
- Pareto
charts
- Malcolm
Baldrige national quality award
Ans: Quality control vs. quality
assurance:
The terms “quality assurance” and “quality control” are often used
interchangeably to refer to ways of ensuring the quality of a service or
product. The terms, however, have different meanings.
Assurance: The act of giving confidence, the state of being certain or
the act of making certain.
Quality Assurance: The planned and systematic activities implemented in a
quality system so that quality requirements for a product or service will be
fulfilled.
Control: An evaluation to indicate needed corrective responses;
Q. 2 Explain the steps of an organizational change model.
Ans : Step of the organizational
change model :
The concept of "change management" is a familiar one in most
businesses today. But, how businesses manage change (and how successful they
are at it) varies enormously depending on the nature of the business, the
change and the people involved. And a key part of this depends on how far
people within it understand the change process. Here we are discussing Lewis
change management model.
1. Unfreeze
Q.3 Write short notes on:
Role of inspection in quality
management
Communities of practice vs.
business units
Cycle time optimization
Supplier quality rating
Ans: Role of inspection in
quality management :
Critical appraisal involving examination, measurement, testing, gauging,
and comparison of materials or items. An inspection determines if the material
or item is in proper quantity and condition, and if it conforms to the
applicable or specified requirements. Inspection is generally divided into
three categories: (1) Receiving inspection, (2) In-process inspection, and (3)
Final inspection. In quality control (which is guided by the principle that
"Quality cannot be inspected into a product") the role of inspection
is to verify and validate the variance data; it does not involve separating the
good from the bad.
Q. 4 Explain the five elements of six sigma .
Ans : Five elements of six sigma :
The management strategies like the Total Quality Control, Total Quality
Management and Six Sigma are different from each other. As far as Six Sigma is
concerned, there are five elements which govern the implementation strategy of
this methodology. They are top management commitment, training schemes, project
team activities, measurement system and the stakeholder involvement. Here, the
stakeholders include the employees, owners, suppliers and customers.
Q. 5 Explain errors of measurement and describe the types of sampling
risks.
Ans : Errors of measurement and
controls:
In statistics, a null hypothesis is a statement that the thing being
studied produces no effect or makes no difference. An example of a null
hypothesis is the statement "This diet has no effect on people's
weight."
1. A type I error (or error of the first kind) is the incorrect
Q. 6 Explain the project management value initiative.
Ans : Description of project
management value initiative :
PM value initiative program implementation is an ongoing effort to
execute the program as documented in the document in implementation plan using
the measure packages. Organization strategies and objectives set the
foundations for effective measurement programmes.
Steps of project management value initiative :
Step #1 - Create Business Case –
Dear
students get fully solved assignments
Send
your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call
us at : 08263069601
(Prefer
mailing. Call in emergency )
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.