Q1. Using a
suitable example discuss
the difference between
Technical analysis and Financial analysis of a project. (10
Marks)
Ans 1.
Introduction
Project
management is a multifaceted discipline that entails the meticulous planning,
execution, monitoring, and completion of projects. A critical aspect of this
process is the analysis phase, which can be broadly categorized into two
distinct types: Technical Analysis and Financial Analysis. While they may seem
similar at first glance, these two forms of analysis serve different purposes
and employ diverse methodologies to evaluate the viability and potential
success of a project. Technical analysis focuses on the operational aspects,
including the feasibility, design, and technical requirements of the project.
On the other hand, financial analysis delves into the
Q2. The “billing department” of a chain of department
stores prepares the monthly inventory report for use by the stores’ purchasing
agents. Given the following information,
use the “critical path method” to determine:
(10 Marks)
a. How long the process will take.
b. Which jobs can be delayed without delaying the
early start of any subsequent activity?
c. Explain how the project can be fast tracked.
Job |
Job Description |
Time (Hours) |
Precedence requirements |
A |
Start |
0 |
- |
B |
Get computer printouts of customer
purchases |
10 |
A |
C |
Get stock records for the month |
20 |
A |
D |
Reconcile purchase printouts and
stock records |
30 |
B,C |
E |
Total stock record by the
department |
20 |
B,C |
F |
Determine reorder quantity for the
coming period |
40 |
E |
G |
Prepare stock report for purchasing
agents |
20 |
D,F |
H |
Finish |
0 |
G |
Ans 2.
Introduction
Project
management is an essential discipline for ensuring the successful completion of
projects within a designated timeframe and budget. One critical technique in
this field is the Critical Path Method (CPM), a step-by-step project management
approach to schedule a set of project activities. It is widely used for
complex, but routine, operational or production projects like the one described
for a billing department of a chain of department stores. The objective of this
analysis is to apply CPM to the given task of preparing a monthly inventory
report. By examining the sequence of jobs, their duration, and dependencies, we
aim to identify the project's longest stretch of dependent activities (the
critical path), calculate the
Q3. Rail Vikas
Nigam (RVNL) has given Larsen and Toubro Construction (L&T) an Rs 2,447
crore contract to design and construct the Kolkata underground metro project in
the city’s Joka-Esplanade Metro Corridor.
According to an L&T press statement, the major
works for the project include the design and construction of the Ramp and
Underground Metro railway works from Mominpur to Esplanade, covering a distance
of 5.05 km. The works comprise constructing four underground stations, namely
Khidderpore, Victoria, Park Street, and Esplanade, along with tunnels created
using Tunnel Boring Machine (TBM) and Cut & Cover methods.
The scope of the contract also includes architectural
finishing works, track works, and other related activities.
(Source: https://www.indianarrative.com/economy-news/rs-2447-crore-project-to-build- kolkata-metros-4-underground-stations-goes-to-lt-149218.html)
a. Explain the
various characteristics of Kolkata underground metro project. (5 Marks)
Ans 3a.
Introduction
The Kolkata
underground metro project, awarded to Larsen and Toubro Construction by Rail
Vikas Nigam Limited (RVNL), represents a significant advancement in urban
infrastructure development in India. With an allocated budget of Rs 2,447 crore,
this project is not just a testament to the growing emphasis on enhancing
public transportation systems but also a benchmark in complex engineering and
construction. The project encompasses the design and
infrastructure
projects in India and beyond.
b. Discuss in
brief the different activities executed during the project life cycle of the Kolkata
underground metro project. (5 Marks)
Ans 3b.
Introduction
The Kolkata
underground metro project, a monumental infrastructure undertaking, undergoes a
series of meticulously planned activities throughout its project life cycle.
From inception to completion, this project, like any major construction
endeavor, follows a structured project life cycle comprising various phases.
Each phase involves specific activities tailored to meet the project's unique
requirements and objectives. These activities encompass a broad spectrum,
ranging from initial planning and design to construction and eventual
operation. Understanding these activities is essential to appreciate the
complexity and coordination
Dear students, get fully solved assignments by professionals
Do send your query at :
or call us at : 08263069601
(Plagiarism
proofed assignments available with 100% surety and refund)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.