Dear
students get fully solved SMU BBA Spring
2014 assignments
Send
your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call
us at : 08263069601
WINTER 2013, ASSIGNMENT
DRIVE
|
WINTER 2013
|
PROGRAM
|
BACHELOR OF COMPUTER APPLICATION
|
SUBJECT CODE & NAME
|
BC0054 – SOFTWARE PROJECT MANAGEMENT
& QUALITY ASSURANCE
|
SEMESTER
|
5TH SEM
|
CREDITS
|
4
|
MAX. MARKS
|
60
|
BK ID
|
B0958
|
Answer all questions
1.Explain the importance of four P’s
in the software project management spectrum.
Answer : The effective software
project management Focuses on
four P's.
1)
The People
2)
The Product
3)
The Process
4) The
Project
2.Define Statement of Work (SOW).
Which are the Project Management Associations?
Answer : When it comes to implementing or constructing large and
complex systems (such as an enterprise software system), the work requirements
and conditions should be properly documented. Statement of Work (SOW) is such document that describes what needs
to be done in the agreed contract.
Usually, the SOW is written in a precise and definitive language
that is relevant to the field of business. This prevents any misinterpretations
3.Explain briefly about the basic
COCOMO Model.
Answer: The Constructive
Cost Model (COCOMO) is an algorithmic software cost estimation model
developed by Barry Boehm. The model uses a basic regression formula, with
parameters that are derived from historical project data and current project
characteristics.
Basic COCOMO computes software development effort (and cost) as
a function of program size. Program size is
expressed in estimated thousands of source lines of code (SLOC).
4.Write the Conventions followed in
PERT.
Answer : Definition of PERT :
A PERT chart is a graph that represents all of the tasks necessary to a
project's completion, and the order in which they must be completed along with
the corresponding time requirements. Certain tasks are dependent on serial
tasks, which must be completed in a certain sequence.
Four requirements of PERT :
1. Identify the specific activities and milestones.
2. Determine the
proper sequence of the
5
List the various activities under the risk management.
Answer
: Four foundational elements frame what executive management and directors need
to consider when evaluating the best way to implement enterprise risk
management (ERM). These four elements – process, integration, culture and
infrastructure – are intended to be flexible in application because strategies,
organizational structures, operating philosophies and risk profiles vary in
complexity across industries and firms. We
6
Define
a) Software assurance,
Answer : Software assurance
(SwA) is defined as "the level of confidence that software is free
from vulnerabilities, either intentionally designed into the software or
accidentally inserted at anytime during its lifecycle, and that the software
functions in the intended manner."
The main objective of software assurance is to ensure that the
processes, procedures, and products used to produce and sustain the software
(b) Software Engineering,
Answer : Software engineering (SE) is concerned with developing
and maintaining software systems that behave reliably and efficiently, are
affordable to develop and maintain, and satisfy all the requirements that
customers have defined for them. It is important because of the impact of
large, expensive software systems and the role of software in safety-critical
applications. It integrates significant mathematics, computer science and
(c) Software Management,
Answer : "Managing software" and "managing software
development" is a complex subject which is surrounded by a lot of bruhahah
and fancy marketing presentations full of neat-looking flow charts and
ambiguous terminology. I'm trying to establish some common vocabulary so we
sort-of know what we're talking about.
Real
life software management
(d) Software reviews,
Answer : A software review is "A process or meeting during
which a software product is examined by a project personnel, managers, users,
customers, user representatives, or other interested parties for comment or
approval".
In this context, the term "software product" means
"any technical document or partial document, produced as a deliverable of
a software development activity", and may include documents such as
contracts, project plans and budgets, requirements documents, specifications,
designs, source code, user documentation, support and
(e) Code Reviews
Answer : Code review is systematic examination (often known as
peer review) of computer source code. It is intended to find and fix mistakes
overlooked in the initial development phase, improving both the overall quality
of software and the developers' skills. Reviews are done in various forms such
as pair programming, informal walkthroughs, and formal inspections.
Code reviews can often find and remove common vulnerabilities such
as format string exploits, race conditions, memory leaks and buffer overflows,
thereby improving software security. Online software repositories based on
Subversion (
Dear
students get fully solved SMU BBA Spring
2014 assignments
Send
your semester & Specialization name to our mail id :
“ help.mbaassignments@gmail.com ”
or
Call
us at : 08263069601
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.