Dear
students get fully solved assignments
Send
your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call
us at : 08263069601
ASSIGNMENT
DRIVE
|
SPRING 2016
|
PROGRAM
|
MBA
|
SEMESTER
|
IV
|
SUBJECT CODE & NAME
|
OM 0015 – MAINTENANCE MANAGEMENT
|
BK ID
|
B2008
|
Credit & Marks
|
4 CREDIT, 60 MARKS
|
Note: Answer all questions. Kindly note
that answers for 10 marks questions should be approximately of 400 words. Each
question is followed by evaluation scheme.
Question.1.
Write short notes on the following:
a.
Proactive Maintenance
Answer:Proactive maintenance is a preventive maintenance strategy for
stabilizing the reliability of machines or equipment. It has two parts:
Preventive maintenance
Predictive maintenance
b.
Planned Maintenance Work Cycle
Answer:Use Equipment/Plant Maintenance to plan, monitor, and complete routine
maintenance operations. When you use Equipment/Plant Maintenance, you can
minimize equipment breakdowns and unscheduled repairs.
When you use Equipment/Plant
c.
Maintenance organising schedule
Answer:Organizing your daily schedule is something that you know needs to be
done, but where exactly does one start? A lot of people see time management as
a super-power – there’s surely no way that a mere mortal could fit it all in
between 9 and 5! But effectively organizing your daily schedule at work is
simple if you have a plan, and it’s a skill that anyone can learn. These four
guiding principles will help you while organizing your daily schedule.
Think Before You Act: What does the start of your
d.
Areas of Maintenance Practices
Answer:Establishing best practices in production maintenance is an achievable
goal. But it’s a goal that many talk about but few achieve. So why is it so
difficult? And, why are so many manufactures still running at over 90 percent
reactive?
Many blame it on the age of their
manufacturing
Question.2.
What do you mean by Asset Strategy? Explain briefly Steps Involved in
Developing an AssetStrategy.
Answer:Strategic Asset Management involves managing the capital investment
towards a long-term program of increasing the ROA. This is a top-down function
of setting a performance specification for each major operating unit,
identifying the critical components of performance, and systematically
improving the key controllable variables of operation.
Managing assets strategically involves every
function
Question.3.
Assume you are the head of the maintenance department in a manufacturing
organisation.You are assigned a responsibility of implementing a maintenance
improvement program. Whatcomponents would you include in the maintenance
improvement program?
Answer:Many confuse availability with equipment reliability. In reality, it is
only one part of the calculation. Availability is the actual time that the
machine or system is capable of production as a percent of total planned
production time. Availability rate should not be confused with overall
availability. The latter is calculated using total calendar time as the
divisor, not planned production time.
Question.4.
What do you mean by Machine Quality? Which Aspects are to be Considered for
MachineQuality?
Answer:In business, engineering and manufacturing, quality has a pragmatic
interpretation as the non-inferiority or superiority of something; it is also
defined as fitness for purpose. Quality is a perceptual, conditional, and
somewhat subjective attribute and may be understood differently by different
people. Consumers may focus on the specification quality of a product/service,
or how it compares to competitors in the marketplace. Producers might measure
the conformance quality, or degree to which the product/service was produced
correctly.
Question.5.
Write short notes on the following
a.Zero
based budgeting
Answer:Zero-based budgeting is an approach to planning and decision-making that
reverses the working process of traditional budgeting. In traditional
incremental budgeting, departmental managers justify only variances versus past
years based on the assumption that the "baseline" is automatically
approved. By contrast, in zero-based budgeting, every line item of the budget,
rather than only the changes, must be approved. Zero-based budgeting requires
that the budget request be re-evaluated thoroughly, starting from the
b.
Remote maintenance audit
Answer:It manages complexity and enables security by providing a single platform
from which to manage remote access policy and connections. Our high-definition
network security auditing goes beyond federal vendor access requirements.
Multiple levels of identification and authentication, agency defined access and
control, comprehensive IT security audit reporting, and real-time monitoring
capability for every remote support session all work together to provide easily
verifiable proof of compliance.
c.
Codification of spare parts
Answer:Codification / cataloguing is basically an identification system for each
item of the inventory. There are often three broad approaches to developing a
suitable identification system:
1.Arbitrary approach:As the name suggests,this approach does not
use any design for codification. Rather, as and when an item is received by
Stores in its receiving bay, a running and unique serialnumber is assigned to
it. This number becomes
d.
Maintenance Benchmarking
Answer:Benchmarking has become a common practice in all kinds of businesses, but
nowhere is it more prevalent than in manufacturing. The idea of measuring
yourself against the best is an attractive one -- one that the gurus say can
lead to breakthroughs in how you run your business. But like many other great
ideas, benchmarking can lead to frustration and disappointment if it isn't
approached with proper understanding.
Question.6.
Discussion questions:
1.
Which condition monitoring techniques have been used to improve plant
maintenance atXYZ?
Answer:Condition monitoring (or,
colloquially, CM) is the process of monitoring a parameter of condition in
machinery (vibration, temperature etc.), in order to identify a significant
change which is indicative of a developing fault. It is a major component of predictive
maintenance. The use of condition monitoring allows maintenance to be
scheduled, or other actions to be taken to prevent failure and avoid its
consequences. Condition monitoring has a unique benefit in that conditions that
would shorten normal lifespan can be addressed before they develop into a major
failure. Condition monitoring techniques are normally used on rotating
2.
Do you think that the implementation of condition monitoring techniques is the
rightdecision of XYZ? Justify your agreement/disagreement
Answer:Condition monitoring is the process of determining the condition of
machinery while in operation. The key to a successful condition monitoring
programme includes:
Knowing what to listen for
How
to interpret it
When to put this knowledge to use
Dear
students get fully solved assignments
Send
your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call
us at : 08263069601
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.