ASSIGNMENT
DRIVE
|
FALL 2016
|
PROGRAM
|
MBA
|
SEMESTER
|
IV
|
SUBJECT CODE & NAME
|
OM 0017 – Advanced Production Planning
& Control
|
BK ID
|
B2010
|
CREDIT AND MARKS
|
4CREDITS AND 60 MARKS
|
Note: Answer all questions. Kindly note
that answers for 10 marks questions should be approximately of 400 words. Each
question is followed by evaluation scheme.
Question.
1. Explain Various Functions of Production Planning and Control.
Answer: Production Planning and Control (PPC) - Functions of Production Planning
and Control (PPC)
Question.
2. Explain the concept of Master Schedule. Also define the Characteristics of
the master schedule.
Answer: A master production schedule (MPS) is a plan for individual commodities
to be produced in each time period such as production, staffing, inventory,
etc. It is usually linked to manufacturing where the plan indicates when and
how much of each product will be demanded. This plan quantifies significant
processes, parts, and other resources in order to optimize production, to
identify bottlenecks, and to anticipate needs and completed goods. Since an MPS
drives much factory activity, its accuracy and viability dramatically affect
profitability. Typical MPSs are created by software with user tweaking.
Question.
3. Define the various steps of VA.
Answer: There are eight distinct steps that most claims for disability
compensation follow. These phases may vary in time depending on the complexity
of the claim, the amount of evidence that must be gathered to support the
claims, and the type of evidence. You are strongly encouraged to submit as much
evidence as possible with your claim to help minimize processing time. The
eight steps of claims processing are as follows:
Step 1. Claim Received
Your claim has been received by the VA. If
you applied online with VONAPP Direct Connect, you should see receipt in your
list of Open Claims within one hour. If you applied through the U.S. mail,
please allow mailing time plus one week for us to process and record receipt of
your claim.
Step 2. Under Review
Your claim has been assigned to a Veterans
Service Representative and is being reviewed to determine if additional
evidence is needed. If we do not need any additional information, your claim
will move directly to the Preparation for Decision phase.
Step 3. Gathering of Evidence
Question.
4. Write Short notes on
a.
Hybrid 1: MRP with lean principles
Answer: When the demand pattern is very stable and has a radical design change of
product, most of the planning and execution can be achieved by using MRP.
However, to provide better stability to the system, some of the lean principles
are also used to integrate with MRP. "MRP (Material Requirements
Planning)" is a concept of creating material plans and production
schedules based on the lead times of a supply chain. However,
b.
Hybrid 2: Kanban with MRP planning
Answer: In conventional MRP procedures, production quantities and dates are
calculated in accordance with actual customer/planned independent requirements
and the required quantity and dates of the components are calculated by
exploding the bill of material. The production quantities can be compiled for various
requirements. The creation of lot sizes is based on the selected lot sizing
procedure. In each production level, the lots are usually produced completely
before being passed on for further processing.
c.
Hybrid 3: MRP for capacity and long lead time
Answer: Managers often took obviously inappropriate action because of the old
OP, OQ method. Demand surges invariably caused shortages; small shortages
triggered production of parts even when people knew there would be no near-term
demand for the part. Against this flawed system, MRP—the first generation of
what is now MRP II—had obvious merit and won wide acceptance very quickly.1
MRP to the Rescue. The concept behind
d.
Hybrid 4: Pull system with spike control
Answer: An inventory manager must be able to develop an effective inventory
control system to manage customer demand. The demand for the product will
control inventory costs, carrying costs, ordering costs and storage costs.
Inventory control systems are generally categorized as push or pull models.
Knowing the definitions, advantages and disadvantages of each system will help
a company establish which inventory control method works best for their
organization.
Push System: The push system of inventory
Question.
5. Differentiate between Mass Production and Batch Production.
Answer: The Romans used Mass Production to build a navy from the example of a
single Carthaginian ship to build hundreds of identical ships in a very short
period. The Venetian Arsenal was doing that with shipbuilding by the Medieval
Era if not before. The British were using flow production to manufacture Brown
Bess
Question.
6. Elaborate various Elements of cost.
Answer: The following chart shows the various elements of cost and how they are
classified.
Dear
students get fully solved assignments
Send
your semester & Specialization name to our mail id :
“
help.mbaassignments@gmail.com ”
or
Call
us at : 08263069601
(Prefer
mailing. Call in emergency )
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.