OM 0015 – MAINTENANCE MANAGEMENT
|
BK ID
|
B2008
|
CREDITS AND MARKS
|
4 CREDITS AND 60 MARKS
|
Note: Answer all questions. Kindly note
that answers for 10 marks questions should be approximately of 400 words. Each
question is followed by evaluation scheme.
Question.1.
Write short notes on the following:
a.
Proactive Maintenance
Answer:Proactive maintenance is a preventive maintenance strategy for
stabilizing the reliability of machines or equipment. It has two parts:
·
Preventive
maintenance
·
Predictive
maintenance
A proactive maintenance plan gives a company
the ability to prolong the life of machinery and prevent a complete and
unexpected breakdown of production facility. A proactive maintenance plan
allows an organization to schedule
b.
Planned Maintenance Work Cycle
Answer:Planned preventive maintenance (PPM), more commonly referred to as simply
planned maintenance (PM) or scheduled maintenance, is any variety of scheduled
maintenance to an object or item of equipment. Specifically, planned
maintenance is a scheduled service visit carried out by a competent and
suitable agent, to ensure that
c.
Maintenance organising schedule
Answer:It is important to understand the difference between planning and
scheduling. These two elements of maintenance management are essential and are
very often mixed up. Most organizations, where scheduled shutdowns of the
manufacturing process are common, plan and schedule work quite good because
there is a consequence if they do not.
Planning and scheduling of weekly/daily On-
d.
Areas of Maintenance Practices
Answer:The maintenance organization of today, like many departments, is under
continued pressure to cut costs, show results, and support the mission of the
organization. After all, it is a logical expectation from the business
standpoint.
The evolving maintenance operation has been
charged with supporting the broader efforts of World Class Manufacturing such
as Six Sigma, Lean Manufacturing and major quality initiatives. The ability to
be successful in that charter lies
Question.2.
Explain different types of maintenance tasks.
Answer:Maintenance organizational efficiency depends upon many interdependent
variables. Some of these include: organizational structure, goals and
objectives, communications processes, policies and procedures, work processes
(methodologies) and employee systems. Maintenance organizations function at
three major levels: organizational level (functional and structural
relationships), process level (work activities) and job performer level (individual
worker.
The ineffectiveness of one level could
negatively impact another level. For example, poorly defined work activities,
such as the lack
Question.3.
Explain following Aspects to be Considered for Machine Quality
Conformance
to machine specifications
Frequency
of machine failures
Answer:Eight dimension of product quality management can be used at a strategic
level to analyze quality characteristics. The concept was defined by David
Garvin. Some of the dimensions are mutually reinforcing, whereas others
Question.4.
What do you mean by Condition Monitoring? Elaborate various Steps Involved in
Condition Monitoring Program
Answer:Condition monitoring (or, colloquially, CM) is the process of monitoring
a parameter of condition in machinery (vibration, temperature etc.), in order
to identify a significant change which is indicative of a developing fault. It
is a major component of predictive maintenance. The use of condition monitoring
allows maintenance
Question.5.
Write short notes on the following-
a.
Zero based budgeting
Answer:Zero-based budgeting (ZBB) is a method of budgeting in which all expenses
must be justified for each new period. Zero-based budgeting starts from a
"zero base," and every function within an organization is analyzed
for its needs and costs. Budgets are then built around what is needed for the
upcoming period, regardless of whether the budget is higher or lower than the
previous one.
Zero-based budgeting allows top-level
strategic goals to be implemented into the budgeting process by tying them to
specific functional areas of the
b.
Remote maintenance audit
Answer:To protect the integrity of the Postal
computing environment, use of remote administration and maintenance software
and associated security controls must be approved by the manager, CISO ISS, in
cooperation with the requesting organization.Remote management and maintenance must be controlled and activity logs
maintained. The
c.
Codification of spare parts
Answer:It is a cumbersome and time consuming task during every transaction to
identify a spare part by its description and manufacturer's part number
accompanied by the parent equipment's name, make and model designation.
Therefore, it is essential to give a numerical name or code to each spare part.
This process of giving code to each spare part is called codification. Since,
the range of spares used in any organisation is
d.
Maintenance Benchmarking
Answer:Benchmarking has become a common practice in all kinds of businesses, but
nowhere is it more prevalent than in manufacturing. The idea of measuring
yourself against the best is an attractive one -- one that the gurus say can
lead to breakthroughs in how you run your business. But like many other great
ideas, benchmarking can lead to frustration and disappointment if it isn't
approached with proper understanding.
For example, Edwin K. Jones, a plant
engineering
Question.6.
Describe various types of preventive maintenance.
Answer:The primary goal of maintenance is to avoid or mitigate the consequences
of failure of equipment. This may be by preventing the failure before it
actually occurs which Planned Maintenance and Condition Based Maintenance help
to achieve. It is designed to preserve and restore equipment reliability by
replacing worn components before they actually fail. Preventive maintenance
activities include partial or complete overhauls at specified periods, oil
changes, lubrication, minor adjustments, and
Dear
students get fully solved assignments
Send
your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call
us at : 08263069601